Pool Installation Process

Pool Production Process

Place for Pool

Step 1:

We will come to site to evaluate positioning, access and pool requirements.

Place for Pool

Step 2:

A Template of the pool shape is laid out on the ground to create the initial shape of the pool.

Pool working

Step 3:

The measurements of the pool are checked and squared up relevant to houses or other surrounding structures. Once we are happy with the pool positioning an excavator is ready to start digging the pool hole.

Place for Pool

Step 4:

The pool hole is then dug and the excavated materials are removed from site.

Step 5:

The base material is then screaded to set heights for the pool to be placed into position.

Vehicles

Step 6:

The crane is then positioned and set up. In this case the crane was set up at the front of the house with the pool being lifted over the house roof.

Above Ground Swimming Pools

Step 7:

The pool is then connected to the crane and the lift begins.

Above ground swimming pools

Step 8:

Swimming pool being lifted over the roof of the house.

Swimming Pool Antifreeze

Step 9:

The pool is then lowered down into position.

Swimming Pool Antifreeze

Step 10:

The pools final sitting position is measured and squared up before the crane leaves the site, levels at this stage are also checked.

swimming pool equipment

Step 11:

Pipework, filters and lights are all connected and the process of back filling the water begins.

pool equipment

Step 12:

The concrete bond beam/slab are then prepared and poured awaiting pavers/tiles to finish off the pool.

Step 13:

The coping pavers/tiles are installed and your swimming pool water is balanced ready for swimming.

4 Quick and Easy Steps To Install Your Swimming Pool

Owning your dream swimming pool has never been faster, easier or more affordable with The Pool Company, Queenstown.

1. Request Your Free Quote

Our Friendly Pool Co. team will contact you to organize an onsite quotation.

2. Approve Your Quote

Our experienced team member will then organize all council approvals prior to commencement of your job.

3. We'll Install Your Pool

The pool excavation and construction process will begin & can be completed in as little as seven hassle free days.

4. You Enjoy Your Pool

Swim, relax and have fun with your family and friends for years to come with one New Zealands’ favourite swimming pools.